    In the final days of June 2026, construction activities at PTH Boiler’s latest project site are in full swing. Our team is fully committed to one of the most critical phases of the project—the erection and installation of a high-capacity 16 T/H Step Grate Boiler System. Every activity is being executed with precision and strict adherence to the project schedule, ensuring this "heart of the energy system" is ready for on-time commissioning and handover to the customer.

     

    (Project Site Photos)

    Under the close supervision of PTH Boiler’s Project Management Team and on-site construction engineers, every major component—from the boiler body and economizer to the flue gas treatment system—is being carefully lifted, positioned, and installed onto its foundation with the highest level of safety. Each installation activity is carried out in strict compliance with the Owner’s stringent technical specifications and quality requirements.

    High-Efficiency Energy Solutions for the Industrial Textile Industry

    To meet the demanding steam requirements of a large-scale textile manufacturing facility, PTH Boiler’s 16 T/H boiler system has been optimally engineered to address the industry's most critical operational challenges:

    • Optimized Operating Costs (Steam Cost): Advanced combustion technology maximizes heat utilization, delivering exceptional fuel efficiency and significantly reducing steam production costs.

    • Reduced CO₂ Emissions: Flue gas is treated through PTH’s multi-stage air pollution control system to ensure compliance with environmental emission standards, supporting the textile industry's transition toward a greener and more sustainable global supply chain.

    • Stable Operation: An intelligent automation and control system maintains consistent steam pressure and flow, ensuring a reliable steam supply for the stringent production processes of textile manufacturing facilities.

    Ready for Commissioning and Handover

    Following the completion of equipment lifting and installation, PTH Boiler will proceed with the installation of auxiliary piping systems, electrical wiring and control system integration, followed by system calibration and performance testing under load.

    The trust and confidence of our valued Customers are the greatest motivation for PTH Boiler to continue delivering intelligent, reliable, and cost-effective industrial boiler systems that maximize operational efficiency and create long-term value.

    Related Articles

    25 Sep, 2025

    MID-AUTUMN BONDING - SHARING LOVE AT PHUC TRUONG HAI

    Mid-Autumn Festival is not only a time for family reunion, but also an occasion to share love and strengthen team spirit. Embracing this warm atmosphere, the Board of Directors of Phuc Truong Hai Co., Ltd. presented meaningful Mid-Autumn gifts to all workers.

    04 Nov, 2025

    SHARING TRUST - NURTURING KNOWLEDGE

    Phuc Truong Hai accompanies Polytechnic students on their journey to pursue dreams Throughout more than thirteen years of development, Phuc Truong Hai Co., Ltd. has always believed that the sustainable value of a business lies not only in its economic achievements, but also in the positive impact it creates for the community.

    03 Dec, 2025

    PHUC TRUONG HAI PARTICIPATES IN THE 2025 ENERGY EFFICIENCY AND GREEN TRANSITION EXHIBITION

    Recently, Phuc Truong Hai Co., Ltd. (PTH Boiler) was honored to participate in the 2025 Energy Efficiency and Green Transition Exhibition, organized by the Ministry of Industry and Trade in Hanoi. The exhibition brought together leading enterprises from across the industrial sector, showcasing innovative technologies and advanced solutions in energy efficiency, green transformation, and sustainable industrial development.

    10 Feb, 2026

    PHUC TRUONG HAI YEAR-END PARTY 2025 – HONORING THE FIRE KEEPERS, CONTINUING THE JOURNEY OF DEVELOPMENT

    “Igniting 2026 – Ready for a New Journey” Closing a year marked by many memorable milestones, Phuc Truong Hai enters 2026 with confidence, proactiveness, and a strong commitment to innovation. The spirit and dedication nurtured throughout 2025 will continue to drive PTH forward, delivering sustainable value to our customers and partners in the journey ahead.

    20 May, 2026

    PHUC TRUONG HAI CONDUCTS 6G WELDING SKILL ASSESSMENT: READY FOR NEW PROJECT DEPLOYMENT

    6G welding (welding pipes at a fixed 45-degree incline) is recognized as one of the most challenging levels in pressure welding technology. At Phuc Truong Hai, this has become a mandatory standard for all welders directly involved in fabricating pressure vessels, waterwall systems, and boiler heat-resistant components.

    02 Jun, 2026

    5S Standards at Phuc Truong Hai Workshop: Small Discipline, Great Value

    In the heavy machinery and pressure equipment manufacturing industry, an organized workspace is the cornerstone of precision and absolute safety. At Phuc Truong Hai, the 5S standard (Sort - Set in order - Shine - Standardize - Sustain) is far from a mere slogan; it is our core culture and the ultimate yardstick for our team's discipline.

    27 Jun, 2026

    A Sincere Thank You From Phuc Truong Hai – Closing An Emotion-Filled Journey At Denimsandjeans Vietnam 2026

    The two days of the Denimsandjeans Vietnam 2026 Exhibition (June 24 - 25, 2026) have flown by, but the valuable conversations, meaningful insights, and trust that our Customers and Partners placed in Phuc Truong Hai (PTH Boiler) remain deeply valuable.

    18 Jul, 2026

    PTH Boiler 15th Anniversary Celebration (2011–2026)

    The 15th Anniversary Celebration of Phuc Truong Hai Co., Ltd. (PTH Boiler) was successfully held with the distinguished presence of the Company's Board of Directors, valued Customers, trusted Business Partners, and all employees.

    21 Jul, 2026

    [PROJECT] The Journey to Delivering a 16 T/H Biomass Steam Supply System – Step Grate Boiler

    Bringing a large-capacity industrial boiler system into safe and efficient operation requires a fully integrated execution process, precise engineering, and strict quality control at every stage. Recently, Phuc Truong Hai Co., Ltd. (PTH Boiler) successfully completed and delivered a turnkey 16 T/H Biomass Steam Supply System featuring a Step Grate Boiler.

    10 Sep, 2026

    ANOTHER “ENERGY HEART” SUCCESSFULLY COMPLETED BY PHUC TRUONG HAI

    Recently, Phuc Truong Hai successfully completed, delivered, and installed a 6 T/H fluidized-bed boiler in Dong Thap, ready for commissioning and steam generation to support the customer’s production requirements.

    29 Sep, 2026

    CONTINUING OUR JOURNEY OF SUPPORTING THE NEXT GENERATION

    As part of our annual commitment, Phuc Truong Hai continues to provide scholarships to students of the University of Technology, offering encouragement and support as they pursue their academic journey and future aspirations.

    09 Oct, 2026

    SPORTS DAY 2026

    Recently, companies across our shared ecosystem came together for the annual Sports Day, a meaningful event held to celebrate the anniversary while providing an opportunity for employees to connect, build relationships and strengthen team spirit.