Article Content
PHUC TRUONG HAI COMPLETES AND DELIVERS A 6 T/H FLUIDIZED-BED BOILER IN DONG THAP
From engineering design and fabrication to final completion, every stage of the project is carefully carried out by Phuc Truong Hai to ensure quality and compliance with technical requirements.
Recently, Phuc Truong Hai successfully completed, delivered, and installed a 6 T/H fluidized-bed boiler in Dong Thap, ready for commissioning and steam generation to support the customer’s production requirements.
PROJECT INFORMATION
- Capacity: 6 tons of steam per hour (6 T/H)
- Equipment: Fluidized-Bed Boiler
- Installation Location: Dong Thap, Vietnam


With a focus on developing energy solutions that are efficient and tailored to actual production requirements, PTH Boiler continues to accompany customers throughout every project – from engineering design and fabrication to installation and commissioning.
Related Articles
22 Nov, 2024
Success Through Responsibility: Dong Nai Provincial People's Committee Awards Certificate of Merit – A Source of Pride for Phuc Truong Hai
09 Sep, 2023
Công ty Phúc Trường Hải tham gia hội thảo “Tài chính xanh và thị trường tín chỉ carbon”
04 Dec, 2023
Xu hướng đầu tư năng lượng tái tạo trên thế giới?
21 Jul, 2023
12th Anniversary Celebration of Phuc Truong Hai Co., Ltd
24 Jul, 2024
The 2024 Team Building Trip and the 13th Anniversary Celebration of Phuc Truong Hai Co., Ltd.
06 Nov, 2024
PHUC TRUONG HAI AND THE JOURNEY OF CULTIVATING YOUNG POTENTIAL
29 Nov, 2024
THE JOURNEY OF CONNECTION: PHUC TRUONG HAI PARTNERS WITH A JAPANESE CLIENT
18 Jan, 2025
NOTICE OF LUNAR NEW YEAR HOLIDAY 2025
13 Feb, 2025
PHUC TRUONG HAI COORDINATES THE OCCUPATIONAL SAFETY & 5S TRAINING SESSION
04 Mar, 2025
PHUC TRUONG HAI – EMPOWERING EDUCATION, BUILDING A BRIGHTER FUTURE
21 Apr, 2025
